Call NowFree Quote
Serving Mason, MI

New Driveways & RV Pads in Mason, MI

Mason is where we live and where Family Grade & Gravel is based. Our shop is on Chickasaw Drive, our trucks come and go off Cedar Street and US-127 every day, and our crew lives within a few miles of the courthouse. Local response time on a Mason job is typically same-day for the visit and next-day for the start.

Distance
Local
Drive
5 min
County
Ingham

About Our Work in Mason

Mason is our home town. Most of our crew lives within five miles.

New driveways and RV pads are not just dump-and-go jobs. We start with site evaluation, proper excavation, a compacted base layer, then finish with the right surface aggregate for the load. Whether you are building a brand new home or carving out an RV pad on the side of your property, we handle it from bare ground to finished surface.

Neighborhoods and roads we work in Mason:

downtown MasonCedar ParkKipp Corners areaChickasaw Drive corridorCedar StreetUS-127Mason CourthouseAurelius Road

Ground Conditions in Mason

Mason sits on rich loam over a clay subsoil, typical for southern Ingham County. Drainage is moderate on flat lots and can be poor on properties tucked into the swales south of Ash Street. Because we live here, we know which streets sit low and which subdivisions drain well, so we adjust base thickness by location instead of using one recipe for every Mason job.

Common Mason problem

Older Mason drives on the Cedar Street side often sit lower than the road, so runoff pools at the apron and freezes into ice sheets in the winter.

How we handle it

We regrade the apron with 6 inches of 22A and slope the first 15 feet at about 2 percent back toward the road so water sheds to the street gutter instead of pooling at the garage.

Recent project in Mason

Installed a new 320-foot driveway on a wooded lot off Barnes Road this spring. Homeowner wanted a natural country look, so we ran 21AA base with a 23A top and shaped a slight crown for runoff. Total install was three working days including tree clearing and final rolling.

What’s Included

Our new driveways & rv pads work in Mason includes everything below. No surprise extras, no shortcuts.

Brand new driveway construction (gravel)

RV and travel trailer parking pads

Boat and equipment storage pads

Site evaluation and layout

Excavation and removal of topsoil and unsuitable material

Compacted base layer (typically 4-6 inches of base stone)

Surface aggregate (typically 2-3 inches of finish gravel)

Proper crown and drainage on every install

Edge definition and hand-finishing

How It Works

1

Site Visit

Mark walks the area with you, discusses the intended use (daily driver vs. RV vs. boat), and lays out the dimensions.

2

Excavate

Topsoil, sod, and unsuitable material are removed to depth. Most pads need 6-10 inches excavated to make room for proper base and surface.

3

Base Layer

Compacted base stone goes down first. This is what holds up to the weight without settling.

4

Surface Layer

Finish aggregate (typically 1 1/4 crushed limestone) is spread, leveled, and compacted.

5

Drainage & Crown

Driveway is crowned for water runoff. Pads are pitched gently away from buildings.

Questions from Mason Homeowners

Do you serve Mason, MI?

Yes, Mason is our home town. Family Grade & Gravel is based on Chickasaw Drive in Mason. We work in town every week.

How quickly can you get to a job in Mason?

Same-day for most estimates and next-day starts on smaller jobs. Larger projects get scheduled within 1 to 2 weeks depending on the season.

How much excavation does a new driveway need?

Most residential driveways need 6-8 inches excavated to make room for a proper base. RV pads usually need 8-10 inches because of the heavier loads.

How much does a new gravel driveway cost?

Cost depends on length, width, and how much excavation is needed. A typical 100-foot residential driveway runs in the $3,000-7,000 range. Free estimates always.

Do RV pads need to be different from regular driveways?

Yes. RVs put a lot of weight on a small footprint, so RV pads need a thicker base layer and a heavier-duty aggregate. We size it for the actual RV.

How long does a new install take?

Most residential driveways are done in 1-2 days. RV pads are typically done in a single day.

New Driveways & RV Pads in Other Mid-Michigan Cities

We handle new driveways & rv pads across the greater Lansing area. Pick your city for local details.

Other Services We Do in Mason

We aren’t just driveways. Here’s the full list of what we handle locally.

Get a Free Estimate in Mason

Mark will come out to your property in Mason, walk the job, and give you an honest quote. No pressure, no obligation.